High definition Down Hole Drill Pipe - Concentric Casing System With Ring Bit – Spark

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Bear Customer initially, High quality first in mind, we do the job closely with our customers and supply them with efficient and skilled providers for Down The Hole Drill Pipe, Atlas Copco Dth Hammer Catalog, Dth Drill Pipe, To acquire a consistent, profitable, and constant growth by getting a competitive advantage, and by continuously increasing the value added to our shareholders and our employee.
High definition Down Hole Drill Pipe - Concentric Casing System With Ring Bit – Spark Detail:

Application

Applied to over burden formation with complex topographic and geological conditions, such as gravel, fissured formation, boulder, landfill of construction etc.

Specification

  D   h H C G    
Specification O. D. of Casing Tube (mm) I.D. of Casing Tube(mm) Wall thickness of casing (mm) Max. O.D. of pilot bit (mm) Ring Bit O.D. (mm) Max. O.D. of Normal Bit (mm) Hammer Type Weight(kg)
TOP hammer type
P76/7-39 76 62 7 57 88 39 R32 3.2
P89/8-58 89 73 8 70 100 58 T38 5.8
P114/9-84 114 94 10 92 126 84 T45 7.5
P127/10-93 127 107 10 105 142 93 T45 10
P140/10-97 140 120 10 116 161 97 T45,T51 15
DTH hammer type
P114/9-84 114 94 10 94 126 84 COP34/COP32/DHD3.5 12
P127/10-93 127 107 10 105 142 93 COP34/COP32/DHD3.5 16
P140/10-97 140 120 10 116 161 97 COP44/DHD340/M40/SD4/QL40 21
P146/10-110 146 126 10 124 165 110 22
P168/12.7-127 168 142.6 12.7 141 188 127 COP54/DHD350/M50/SD5/QL50  27
P178/12.7-131 178 152.6 12.7 150 196 131 32.5
P194/12.7-145 194 168.6 12.7 166 214 145 COP64/DHD360/M60/SD6/QL60 42.5
P219/12.7-170 219 193.6 12.7 191 243 170 58
P245/12.7-195 245 219.6 12.7 214 268 195 DHD380/COP84/SD8/QL80 78
P254/12.7-203 254 228.6 12.7 224 276 203 84.5
P273/12.7-223 273 247.6 12.7 241 305 223 100
P325/12.7-276 325 299.6 12.7 292 350 276 135
P406/12.7-350 406 380.6 12.7 377 442 350 DHD112/QL120/SD12/N120 280
P508/12.7-416 508 482.6 12.7 478 545 416 522
P560/12.7-475 560 534.6 12.7 528 595 475 NUMA180SD18/Numa180/TH18/TS18/TK18 620
P610/12.7-513551 610 584.6 12.7 558 645 513 NUMA180 710

Operation Schematic Figure

Concentric casing - 1
Concentric casing - 2
Concentric casing - 3

Step1: The drilling in over burden formation is finished.

Step2: Reverse rotation of the hammer and pull the pilot bit out from the hole.

Step3: Replace the pilot bit with normal bit to continue drilling down.

Product Details

Concentric casing - 4
Concentric casing - 5


Product detail pictures:

High definition Down Hole Drill Pipe - Concentric Casing System With Ring Bit – Spark detail pictures


Related Product Guide:

As for aggressive price ranges, we believe that you will be searching far and wide for anything that can beat us. We can easily state with absolute certainty that for such high-quality at such price ranges we're the lowest around for High definition Down Hole Drill Pipe - Concentric Casing System With Ring Bit – Spark , The product will supply to all over the world, such as: Gambia, Armenia, Italy, With the effort to keep pace with world's trend, we will always endeavor to meet customers' demands. If you want develop any other new products, we can customize them for you. If you feel interest in any of our products or want develop new products, please feel free to contact us. We are looking forward to forming successful business relationship with customers all over the world.
  • The company keeps to the operation concept scientific management, high quality and efficiency primacy, customer supreme, we have always maintained business cooperation. Work with you,we feel easy!
    5 Stars By Ada from Barbados - 2017.09.29 11:19
    It is not easy to find such a professional and responsible provider in today's time. Hope that we can maintain long-term cooperation.
    5 Stars By Gary from United States - 2018.09.08 17:09
    Write your message here and send it to us